Minda Corporation – Case Study

Design reuse:

Initiative:

Manage the entire design data in a centralized repository with complete control on data security

Result:

Increased design reuse, reduced errors and cut design cycle time

 

Design collaboration:

Initiative:

Having the same drawing version at all point of use for manufacturing, purchasing and etc. Eliminating paper drawings submission for design review

Result:

Design collaboration within engineering team and extended team is easy and eliminated manual intimation.

 

Improve Design Re-use:

Initiative:

Re-use old project designs for new projects

Result:

Sharing data between design & manufacturing departments , Other plant, and vendors was made easier by using PTC Windchill

 

Automate Design release process:

Initiative:

All designs need to be released through auto routing process and system driven.

Result:

Re-works due to referring wrong drawing version was completely eliminated. Entire design & related data in one location for easy search & retrieval

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *