 
Adroitec conducts the technology training on Oracle Primaverafor the students ofVasavi College of Engineering. Students were enthusiastic and the sessions went well in an interactive manner by taking the real-time examples. Thirty-seven students were trained by two of the Adroitec’s trainers with an objective to enable students to gain sufficient knowledge of the software and to make them career ready after graduation. The students were benefitted by the approach of the technical insights and had a detailed interaction with the specialist from Adroitec.